Shelter One - Bioreformation

Highslide JS
06/02/2012 - Shelter being prepared for the first sanding.
Highslide JS
31/03/2012 - Shelter sanded, being prepared for painting with used cooking oil.
Highslide JS
31/03/2012 - Painting with used cooking oil.
Highslide JS
08/04/2012 - Painting with used cooking oil.
Highslide JS
19/04/2012 - Placing Woods.
Highslide JS
26/06/2012 - All woods placed.
Highslide JS
03/07/2012 - Beginning Coating Part Internal with Cob and CobWood.
Highslide JS
14/07/2012 - Second inner layer CobWood.
Highslide JS
04/08/2013 - Half-way through the Inside CobWood, and my tent and hammock.
Highslide JS
04/08/2012 - Half-way through the Inside CobWood, now with the first window in Cob.
Highslide JS
11/08/2012 - Inside complete with CobWood, waiting for just the plaster.
Highslide JS
26/08/2012 - Inside complete with CobWood, waiting for just the plaster.
Highslide JS
26/08/2012 - Cob view of windows from the outside.
Highslide JS
01/09/2012 - Testing several recipes from eco plasters.
Highslide JS
04/09/2012 - Results of tests of plaster cracks
Highslide JS
09/09/2012 - First Hand Plaster.